ORION III (ΩΡΙΩΝ ΙΙΙ)

-Farmakoris-Villiotis NE

Built in 2018 (age 3). Registered in Piraeus. Current line: Rion-Antirrion

The double-ended ferry ORION III was ordered in 2017 by the Greek company Farmakoris-Villiotis NE, right after her sister ship and fleetmate, the ORION II, was sold to Mexican company Ultramar during her own construction. She was completed in Greece in 2018, and was inserted on the Perama-Salamina line. In 2019 she was deployed on the Megara-Salamina line, before heading back to the Perama-Salamina line in 2020. In 2021 she was deployed on the Rion-Antirrion line.

PHOTOS (2020):

ORION III
ORION III

The ORION III resting in Salamina (8/2020).

ORION III
ORION III

The ORION III resting in Salamina (8/2020).

ORION III
ORION III

The ORION III resting in Salamina (8/2020).