top of page

GLYKOFILOUSA IV (ΓΛΥΚΟΦΙΛΟΥΣΑ ΙV)

-Panagia Glykofilousa NE

Built in 2017 (age 6). Registered in Piraeus. Current line: Perama-Salamina

The impressive double-ended ferry GLYKOFILOUSA IV was built in 2017 in Greece, She was delivered to the Greek company Panagia Glykofilousa NE, becoming the sixth ship delivered in the enterprise's history, alongside her sister ship, the GLYKOFILOUSA V. She was deployed on the Perama-Salamina line. She is undoubtedly one of the most modern and exciting double-ended ferries to have ever been built.

PHOTOS (2018, 2019, 2020, 2021):

bottom of page